Nebula Regenerative Battery Cell Test System All-in-one Climate Chamber
Integrates DC bus technology with climate chamber control for seamless battery testing. With distributed DC bus and bidirectional inverter, it maximizes energy efficiency and reduces costs while enhancing accuracy and safety. Its compact design cuts down on wiring and sheet metal, optimizing both space and resources. Customizable to meet diverse testing requirements, it offers an efficient, adaptable solution for advanced battery testing.
Scope of Application
Power Battery
Energy Storage Battery
Product Feature
All-in-One Design
Climate chamber and testing system as one to maximize channel density and meet diverse testing need
Common DC Bus
Deliever up to 85.5% energy efficiency, while minimizing energy consumption
Automatic Current Grading
Automatic Current Grading
High-Current Testing
Up to 600A high-current coverig wide range of
DCIR high-rate battery tests, reducing extra equipment costs
Energy-Efficient Common DC Bus
The DC bus Architecture efficiently converts regenerative power from battery cells through DC-DC converters, redistributing the energy to other testing channels. It reduces energy costs, and enhancing overall system efficiency.
Space-Saving Integrated Design Environmental Test Chamber
Features a modular power module design with flexible stacking adapting to the chamber space, supporting up to 8 channels per cabinet. It offers scalable testing via parallel connections, saving space and reducing equipment costs. Customizable to meet diverse battery testing needs.
Multi-Current Auto Grading
Automatically switches to the optimal current range during constant current (CC) testing steps, maximizing data precision and resolution.
Engineered for 600A high current
Optimized for performance and cost-efficiency
DCIR (Direct Current Internal Resistance) testing typically requires high-rate discharge, with most tests completed within approximately 30 seconds. The Star Cloud Environmental Chamber Integrated Charge-Discharge System can stably operate at 600A for 1 minute, exceeding standard requirements to fulfill most DCIR high-rate testing demands, thereby reducing equipment procurement costs for users.